Archive news

The specialists-representatives of “WAELCON” LLC once again held an open class at one of the leading universities of Armenia – the National University of Architecture and Construction of Armenia, in cooperation with associate professors N. Egnatosyan and S. Egnatosyan of the Chair of “Heat and Gas Supply and Ventilation”.

Various professional discussions were held with the students, later, for those students who would like to combine study with work, the conditions offered by “WAELCON” organization were presented.

“WAELCON” LLC acts as the General Contractor carrying out large-scale construction activities within the framework of the extensive construction of Areni Wine Hotel Complex of “TUFENKIAN HOSPITALITY” LLC…
Every year in October, Armenian winemakers and thousands of visitors gather in the village of Areni, Vayots Dzor region, to celebrate the Pan-Armenian Wine Festival. This year, the staff of our Company alongside with “TUFENKIAN HOSPITALITY” LLC also took part in the celebration, organizing a beautiful event-exhibition, during which the visitors got acquainted with the activities of our Company and witnessed the ongoing construction works of the Hotel Complex.

It is already five years that Fountain compositions have been giving aesthetic pleasure to the residents and visitors of Kapan city with their uninterrupted work. The operation of fountains requires a meticulous approach and regular service.
The Service Center of “WAELCON” LLC once again carried out the improvement and service work of the Fountain system of Kapan Central Square.

 

Implemented works։
• Universal high-pressure cleaning of the fountain pool
• Special treatment and chemical cleaning works with special tools and liquids of the equipment integrated in the fountain system, including stainless steel drainage system, pumps, fittings, luminaires, water level indicators and pool coverings
• Refinement and restoration of damaged parts of the fountain pool with waterproofing cement, as well as sealing works of horizontal joints
• Waterproofing works with special materials
• Surface preparation works for painting: grinding, polishing, covering with a primer layer in the necessary places
• Painting in 2-3 layers with rubber waterproof paint over the entire surface of the fountain pool floor
• Testing, programming and adaptation of electrical equipment of the general system
• Commissioning works of the general fountain system

 

As a result of regular maintenance works, the Central Fountain of Kapan city continues to captivate with its beauty.

 

Dear Partners! We would like to inform you that after the extensive work carried out in the production factory of “WAELCON” LLC in accordance with international standards, the area of the production zone has been expanded and become even more convenient for organizing various production activities. Our skilled specialists enlarged activities in the workshops, increasing the volumes of production of aluminum doors, windows and structures, as well as air ducts and fittings from galvanized steel plates, which have a unique place in the market.
In the first quarter of 2021, DEVELOPMENT OF NEW PRODUCTIONS is planned, about which will be informed ADDITIONALLY…

PARTNERS